What to Settle Before You Order From a Fence Company in Pequannock, NJ

Orders for fence and railing material are won or lost before anything is loaded, because a fence company in Pequannock, NJ can only ship what the order actually says. Panel style, post type, height, gate hardware and the count of each are set by measurements taken on the property, not by a photograph. Get those right and the material arrives complete. Get them approximate and the job stops halfway down the line while somebody drives back for posts.

MyFence2Go runs a showroom and yard at 65 Route 23 South in Pequannock, where vinyl, aluminum, wood and chain link sit side by side with their finishes, colors and hardware, and material can be picked up on site or delivered to a home or job site anywhere in New Jersey. 

Our counter takes orders from contractors running crews all week and from homeowners setting their first line of posts, and the questions that save both of them time are the same four. What is the run length, what is the ground doing, what has to be contained, and where do the gates go?

This guide covers what to measure, how material and height follow the job, what sits in a delivered order, and what still has to be arranged once it is on the ground.

Related: How a Fence Company Designs Aluminum Fences in Middlesex County, NJ

fence company

What Has to Be Measured Before a Fence Order Is Placed?

A fence order needs three numbers and a sketch: the total run length, the count of corners and end points, and the position and width of every opening. 

Run length is measured in feet along the ground the fence will actually follow rather than across the shortest line, and corners and ends matter because each one takes a different post.

Posts are what the count turns on. A straight run uses line posts at regular spacing, while corners, ends and gates each need a heavier post, and those are priced and stocked separately. An order that counts panels accurately and posts loosely is the one that comes up short on the second day.

Measure the obstructions too. Trees, utility boxes, condenser units, downspouts and window wells all sit where a panel wants to go, and each one either shifts the layout or turns a full panel into a cut. Noting them on the sketch lets the order carry the right number of full panels and the right allowance for cuts.

What Does Fence Post Spacing Decide?

Post spacing decides panel width, because the two are the same number. Fence systems are built around a nominal panel length, and posts go in at that spacing plus the post width. 

Changing the spacing to clear a tree or a utility box means cutting a panel and accepting a shorter bay, not stretching the next one.

That is why the sketch matters more than the total footage. A hundred-foot run with no obstructions and a hundred-foot run broken by three immovable objects take the same panel count and a different post count, and the second one needs a cut allowance on top.

Terminal posts deserve particular attention. Every corner, every end and both sides of every gate are terminal conditions, and an order treating them as line posts arrives light on the heaviest parts in the shipment.

How Is Fence Material Matched to the Job?

Fence material is matched to what the fence has to do, which is a shorter list than the catalog suggests. Screening a patio, containing a dog, enclosing a pool, marking a boundary and protecting a planting bed are five different jobs, and each one points at a different material and infill.

Vinyl holds a solid face well and keeps its color, which suits screening and privacy runs. Aluminum gives an open picket line that follows grade neatly and suits boundaries, pool enclosures and anywhere a view matters. Wood gives a heavier natural face and takes finishing, while chain link encloses a large area with the least material per foot.

Our showroom carries those materials side by side, which makes it straightforward to compare a solid vinyl panel against an open aluminum line for the same run before committing to either.

What Decides the Fence Height to Order?

The job decides the fence height first, and the site decides it second. A screening run generally wants six feet to work against a seated sightline, while a boundary marker does its job at three or four. 

Pool enclosures and anything containing a climbing dog answer to requirements rather than preference, and those are worth confirming with the township before the order is placed.

Height also changes the post. Taller panels load their posts harder and need deeper setting, which changes post length, concrete volume and sometimes post gauge. Ordering six-foot panels against posts specified for a four-foot run is a common and awkward mistake.

Mixed heights on one property are normal and worth planning. A six-foot screening run along one boundary and a four-foot picket across the front are two separate line items with their own posts, and the transition between them takes a post sized for the taller side.

How Does Ground Slope Change a Fence Order?

Ground slope decides between stepping and racking, and the method decides the parts. Stepping holds each panel level and drops it at every post, which leaves a triangular gap under each panel and suits rigid sections. Racking lets a panel follow the slope, which closes that gap but is limited by how far the panel is built to flex.

So the slope has to be known before the style is chosen. A solid vinyl privacy panel racks very little, while an aluminum picket section is built to rack through a useful range. On a steep run that difference decides what the finished line looks like and how many posts it takes.

Racking range varies from style to style across our vinyl fence line, and the counter can confirm it for a given style against the drop measured across the run rather than estimated by eye.

What Actually Arrives on the Truck With a Fence Order?

A fence order arrives as panels or rails and pickets, posts, caps, gate hardware and fasteners, in the counts the order specified. Fencing is sold as a system, and the parts easiest to under-order are the small ones: caps, brackets, screws and the hardware set for each gate.

Concrete, tools and labor do not arrive with the material. Material is delivered to the property or loaded at the yard, and setting it is the customer’s side of the job. That split is the normal arrangement for a supply order, and it is worth being explicit about at the counter.

Our fence delivery service runs on your timeline, with the date and the drop location chosen when the order is placed. On a long run, naming a drop point along the fence line matters, because shifting several hundred feet of panel by hand is the part nobody budgets time for.

How Do Gates Change a Fence Order?

Gates add parts to a fence order and change the opening. A gate is not a panel with hinges on it. It is a separate assembly with its own frame, its own hardware and a pair of posts sized for the load it will swing.

The opening width has to be the clear width you want, measured between the finished posts rather than between the panel ends. Order the gate to the rough opening and it will bind. Order the posts without allowing for hinge and latch hardware and it will not close.

Double gates, and anything wide enough for a mower, a trailer or a truck, need a drop rod and a center stop, which on a soft surface means something solid underneath for the rod to land in. Deciding gate positions at the sketch stage avoids moving a post that is already concreted in.

Related: Need More Privacy or Pet Protection? What a Fence Company in Passaic County, NJ Can Do

What Still Has to Be Arranged After Fence Material Is Delivered?

Utility marking, digging, setting posts and hanging gates all still have to be arranged after delivery. Underground service locating is a free call in New Jersey and it has to happen before any hole is dug, which makes it a scheduling item rather than a material one.

Post setting drives the timeline more than anything else in the sequence. Concrete needs time before panels load the posts, and hanging a gate on a post that has not cured is how a gate ends up out of square. Crews working this daily build that wait into the plan, and first-time installers often do not.

Our installation guides and the support center cover method questions for people doing the work themselves, and the counter is generally the fastest route to settling a parts question in the middle of a job.

How Should Fence Material Be Stored Before It Goes In?

Fence material should be stored flat, supported and out of direct sun where possible. Vinyl panels delivered in warm weather and left leaning against a wall will take a set, and a panel with a bow in it fights the installer at every post.

Wood wants airflow. A banded stack of pressure-treated boards sitting on wet ground for two weeks will cup and twist, which turns a clean run into a wavy one. Sticker the stack, keep it off the soil, and cover the top rather than the sides.

Hardware is the other storage problem, and it is a smaller one with larger consequences. Keeping caps, brackets and gate sets boxed and labeled until the day they are wanted saves the search that otherwise happens at four in the afternoon.

What Makes a Finished Fence Run Look Straight?

A finished fence run looks straight when it starts from a string line and careful work on the first three posts. Everything after them follows what those three establish, and a line set by eye across uneven ground will read as a curve from the kitchen window even when every individual bay is plumb.

A consistent top line matters as much as consistent spacing. On a stepped run the eye reads the steps as a pattern, so even steps look deliberate and uneven ones look like an error, which is a good reason to work the step heights out on paper against the measured drop.

Caps and finish details close it out. Matching caps across the run, a consistent hardware finish and a tidy cut line where a panel meets a wall are the parts people actually notice, and all of them cost very little at the ordering stage.

What Should Be Confirmed Before a Fence Order Is Final?

Five items should be confirmed before a fence order is final, and all of them take a minute at the counter. The run length and post count get checked against the sketch, the material, style and color get named by product rather than by description, and the height gets matched to the post lengths. 

The gate openings need their clear width, swing direction and hardware set confirmed, and the logistics need a pickup or delivery choice, a date and a drop location on the property.

That last item matters more than it sounds. An order that is complete on paper still stalls if it arrives on a day nobody is there to receive it.

Our railings are specified on the same basis and are worth settling at the same visit, since a deck or stair rail shares post, finish and hardware decisions with the fence line running near it.

How Should a Contractor Order Fence Material Differently From a Homeowner?

A contractor should order fence material for the week rather than for the run. A crew moving between jobs carries spare caps, brackets and fasteners, because a missing two-dollar part costs an afternoon when the yard is thirty minutes away in each direction.

Standing accounts and repeat specifications do the rest. Where the same styles come up job after job, the order becomes a product code and a count, and the counter can check stock on it before the crew is loaded.

Delivery scheduling matters more for a crew as well. Material landing on the morning the crew arrives, placed along the line, turns a two-day job into a one-day job more reliably than any other single decision.

Bring Your Measurements to a Fence Company in Pequannock, NJ

A sketch carrying run lengths, corner and gate positions and a note on the slope turns a vague inquiry into an order that ships complete the first time. 

Our team would rather spend ten minutes checking post counts against your measurements than send a second truck out on Thursday.

MyFence2Go stocks fence and railing material for pickup in Pequannock, NJ and delivery anywhere in New Jersey, and the counter is where a specification gets settled. Place your fence material order with MyFence2Go.

In Summary

Does MyFence2Go deliver, or do I need to collect the material myself?

MyFence2Go offers both pickup and delivery. Material can be collected at the Pequannock yard during pickup hours, or delivered to a home address or a job site anywhere in New Jersey, with the date and the drop location agreed when the order is placed. On a long run, having it dropped along the fence line rather than on the driveway saves a considerable amount of carrying.

What measurements should I bring when ordering fence material?

Bring four measurements when ordering fence material: total run length measured along the ground, the number of corners and end points, the clear width of every gate opening, and how much the ground falls across the run. A rough sketch with those marked on it is enough. Those four figures determine panel count, post count, post type, and which styles will rack or step across your slope.

Can I order gates later if the positions are not settled yet?

Gates can be ordered later, though it is usually the costlier route. Gate posts are heavier than line posts and get set with the rest of the line, so adding a gate afterward generally means pulling and resetting a post that is already concreted in. Marking approximate gate positions on the sketch and ordering the heavier posts up front is the cheaper hedge.